A newly built AI computing center in Malaysia plans to deploy hundreds of GB200 high‑density cabinets, with per‑cabinet power consumption exceeding 80 kW. The liquid cooling solution provider responsible for this project required an independent third‑party verification of the cooling system's heat dissipation capacity, CDU flow distribution accuracy, and full‑load power supply stability before the IT equipment went live.
In practice, traditional single‑type liquid‑cooled load banks can only simulate heat dissipation, but cannot replicate the actual operating conditions of GB200 servers: some components within the cabinet still rely on air cooling, so a hybrid scenario of "primary liquid cooling with supplementary air cooling" must be simulated simultaneously; the power supply verification requires two independently adjustable power outputs (air‑cooled and liquid‑cooled) within the same cabinet to test PDU phase current balance and circuit‑breaker thermal trip characteristics; and with a tight schedule, plug‑and‑play standardized test equipment was essential.

The service provider selected Fullde Electronics' LB‑216kW‑AC400V air‑liquid hybrid load cabinet. This solution incorporates three targeted design features tailored for high‑density GPU testing requirements:
① Power ratio matching GB200 typical operating conditions
The cabinet has a total capacity of 216 kW, comprising 168 kW liquid‑cooled (4 × 42 kW modules) and 48 kW air‑cooled (4 × 12 kW modules). This ratio references the typical heat distribution in the GB200 reference architecture, where approximately 78% of the heat is removed by cold‑plate liquid cooling and 22% by air cooling, enabling a 1:1 reproduction of actual thermal load allocation during testing.
② High‑precision step control and integrated protection interlocks
The minimum load step is 1 kW, supporting smooth adjustment from no‑load to full‑load. The system incorporates three‑tier protection for low flow, over‑temperature, and water leakage. When the simulated GPU junction temperature exceeds a configurable threshold (default 80°C), it automatically performs progressive load shedding and triggers audible and visual alarms, preventing damage to the client's piping during testing.
③ Standardized interfaces and rapid deployment
The cabinet dimensions are 600 × 1300 × 2300 mm, with integrated lifting rings and casters. The electrical interface provides eight 63A industrial connectors (male and female paired), while the liquid cooling interface uses DN50 stainless steel 304 piping with FD83 clamps, compatible with on‑site quick‑connect couplings. Upon arrival, the test system can be quickly connected for wiring and water circulation commissioning.
At the Malaysia site, the service provider conducted continuous loaded testing on a modular unit consisting of one CDU and eight cabinets. The system monitors in real time: liquid‑cooled circuit supply/return water temperatures, temperature difference, supply/return pressures and differential pressure, individual module and total flow rates (with low‑flow threshold set at 3.0 m³/h triggering automatic protection); air‑cooled inlet/outlet air temperatures and fan status; and three‑phase voltage, current, active power, frequency, power factor, and current distribution across each connector. It also records alarm events and unloading action logs for over‑temperature, low flow, water leakage, fan faults, etc. Through full‑load operation, the service provider verified the CDU's outlet water temperature stability under continuous thermal load, whether piping pressure drops remained within design limits, whether power circuits had overcurrent or phase imbalance, and the load reduction and recovery logic under redundant configurations.
By introducing this air‑liquid hybrid load bank, the service provider compressed the overall on‑site test time compared with traditional staged approaches, identified and rectified in advance potential issues such as sensor deviations, pipe blockages, and poor contacts, thereby avoiding risks of local overheating or power outages after server deployment. At the same time, comprehensive power, temperature, and flow curves together with test reports were submitted to the owner as key acceptance documentation, strengthening the owner's confidence in delivery quality.

Based on this application, the service provider has planned further expansions: using multiple 216 kW cabinets in parallel to conduct full‑load end‑to‑end testing of an entire floor‑level 2 MW liquid cooling system; integrating the load cabinets via RS485/Ethernet interfaces into a centralized monitoring platform for automated periodic testing and report generation; and, in anticipation of next‑generation GB300 modules with even higher power consumption, collaborating with Fullde to develop higher‑power‑density load modules to keep the test solution future‑ready.